25/02/25
Sent research articles from Google Scholar for self-reading to the team.
Refined the Ideal Gap and Goal with the team.
28/02/25
Presented briefly on the Francis water turbine to the class.
04/03/25
Created the Background (1.1.1., 1.1.2., 1.1.6.) for the Francis water turbine.
Refined the background on the Francis water turbine using ChatGPT
09/03/25
Revised the second stakeholder to be "PUB", (1.1.7.) under the "Introduction" segment of the report
Created the benefits, (3.1., 3.2., 3.3.) segment of the report
Created a template for the methodology, (5.1., 5.2.) segment of the report
12/03/25
Created the reference list for the technical report and edited the intext citations in the report for the Introduction (1.1.1, 1.1.2, 1.1.3., 1.1.4., 1.1.5., 1.1.6 and 1.1.7); Proposed Solutions (2.1.1., 2.2.2. and 2.2.3.); Benefits (3.1., 3.2. and 3.3.) and Evaluation (4.1.1.)
Started on a rough script for the slides
13/03/25
Finished the script for the first round of mock presentation
14/03/25
Edited the script and slides for the Final Presentation
15/03/25
Presented on the introduction
21/03/25
Interviewed Professor Samiran on the Integration of AI and IoTs into the Francis Water Turbine
25/03/25
Fixed grammatical issues, formatting issues and in-text citations that were found in the report after the Zoom session
3/4/25
Edited citations for images
Thanks, Jonathan. I'd like to know where you got the research articles.
ReplyDelete